Tuesday, June 17, 2014

What a difference a day makes

Met the AV contractor up there this evening to talk speaker wire in the media and great rooms and a lot has happened!

View from the front:


Porch beginnings:


New skylight over the stairs:


Creative bathtub installation in the boys' room:


Shower in the boys' bathroom:


View from the master bedroom:


And here are signs of our feathered squatter:


Next up: cabinet walk through tomorrow!



Monday, June 16, 2014

Light speed

Roofing begins today, and on Friday all our second floor tubs and showers arrived on site, some of which are already roughed in. Siding starts next week, and all rough exterior doors will be appearing in the next few days.

Cabinet and electrical walk throughs are tomorrow and Wednesday, and the fireplace will be installed this week as well.

Though we aren't able to move in yet, it seems a couple of neighborhood robins have, as there are nesting materials overhead and on the floor in the entry way and the media room. Finally saw the culprit when walking through with dad yesterday, and I told him not to get too comfortable.

Friday, June 13, 2014

The walls are closing in

Despite the dreary, grey skies and sprinkling that has set in, work continues and we are getting close to having a fully-sheathed structure. Lots of work on the garage today, and it should have a full sheath overhead by the end of the day if all goes apace.

Nothing has changed with the media room or den, so leaving those out of this photo set, but this should give a good sense of progress.

View from the front:



From behind the garage (standing next to the cedar in the northwest corner of the property):



From the same vantage, but focused on the back door and where the back deck will be built:


Standing in the entry way looking into the house:


And looking out:


Great Room (note the plumbing running along the great steel beam. This will be enclosed by an ornamental box beam):


Kids' bathroom upstairs:


Looking down the staircase and landing:


Master Bath (the insulation is where the tiled shower will be, tub to left of the picture, toilet in between behind that little wall):


South bedroom:


Southeast bedroom:


Master Bedroom (that sheetrock is gonna be so comfy!):

Thursday, June 12, 2014

Full speed ahead

Roof color is picked! (burnt sienna)
Exterior color is probably picked! (pistachio green with maroon/white trim)
Roof is sheathed and the roofing begins on Monday!
Fireplace is picked!

Many walkthroughs next week, including cabinets, electrical and HVAC. Framing is finishing up this week or early next, and the back deck is staked out.

Move in date is end of September!

Saturday, June 7, 2014

How far we've come

Finally got around to properly assembling the timelapse photos from the teardown in January. Enjoy. 

Thursday, June 5, 2014

Raise high the roof beam, carpenter

Works been on hold whilst the framer works another job but there is apparently some activity resuming today. Until I get up there next though, here is how it looked day before yesterday:


Designing innards

Walkthroughs have been pushed back for some indeterminate reason, so only the plumbing one is taking place next week. But we've connected with the cabinet company and will begin reviewing styles and designs week after next. If all remains at this pace, it sounds like all plumbing, electrical and cabinets could be in by the end of July.