Flooring seems to be delayed a little but the exterior paint fairies came by and left us a treat!
EDIT: Quick update on flooring: Wood flooring is on site but not installed yet. This is because the manufacturer recommends installing on subfloor/hardwood space with 2-3% moisture, and the subfloor is currently at 12-14%, likely due to aerosolized paint from recent interior painting. Going to test again this afternoon and hopefully begin tomorrow if the subfloor is below 10%.
No comments:
Post a Comment